Fpe fire sprinkler design sf bay area3/31/2024 The Office is designed and built with the Daikin System to allow for flexibility and efficiency in heating and cooling. It is cooled by 10 18,000 CFM swamp coolers with matching 18,000 CFM exhaust fans (4 of which are within the Mega Door). It has approximately 6,100 sf of mezzanine storage, a 1,200 sf Sim Room, two remote restrooms, an in slab deluge fire sprinkler system and an overhead standard hazard fire sprinkler system. The T Hangar has a 420’ clear span with a 97’ tall ridge line. T Hangar & Office: The T Hangar is a 97,000 SF hangar with an attached 20,250 sf two story office. The Fabrication building has its own exterior hazardous storage area for OSHA and State compliance. It has been designed with both fixed and portable dust booths, and natural gas powered generators back up specific tooling processes within the building. This facility is designed with compressed air and power throughout the facility it has a 1,300 sf tool storage room, a weld shop and restrooms. The building has 14,000 sf of Mezzanine storage, 8,000 SF of office space, a break room, a 5,000 sf temperature and humidity controlled refrigeration room for “lay-up” of composite parts, an attached 5,500 sf Oven Building with a 4.8 Million BTU and 2 Million BTU oven for “cooking’ composite parts. Fabrication Building: An 88,000 sf facility completely air conditioned with an energy efficient Daikin System.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |